Task #13

open

Sewage Concerns

Added by John Kent about 1 month ago. Updated about 1 month ago.

Status:
Accepted
Priority:
Red
Assignee:
Start date:
09/08/2024
Due date:
% Done:

0%

Estimated time:
(Total: 0:00 h)

Subtasks 3 (3 open0 closed)

Task #14: Determine source of the effluent in the back yardAcceptedJohn Kent09/08/2024

Actions
Task #15: Cost analysis of connecting to the sewage systemAcceptedJohn Kent09/08/2024

Actions
Task #16: Cost analysis of connecting to the town water systemAcceptedJohn Kent09/08/2024

Actions
Actions #1

Updated by John Kent about 1 month ago

  • Subtask #14 added
Actions #2

Updated by John Kent about 1 month ago

  • Subtask #15 added
Actions #3

Updated by John Kent about 1 month ago

  • Subtask #16 added
Actions #4

Updated by John Kent about 1 month ago

  • Assignee set to John Kent
Actions #5

Updated by John Kent about 1 month ago

  • Status changed from Proposed to Accepted
Actions